Open today by appointment
Oak wood typically needs two to four weeks to acclimatize before installation. This period gives the wood time to adjust to the temperature and humidity of the room, ensuring it remains stable after laying. The exact duration depends on the thickness of the wood, the conditions in the room, and whether the oak is new or antique. The questions below give you a clear picture of what acclimatization involves and what to look out for.
As a rule of thumb, an acclimatization period of at least two weeks applies, but for solid oak, three to four weeks is a more sensible choice in most cases. The thicker the wood, the longer it takes for the moisture content deep in the core to adjust to the surrounding environment. Thin boards of 15 mm respond faster than solid floorboards of 22 mm or more.
The room itself plays a major role. A newly completed building with walls, floors, or cavity walls that are still damp requires a longer acclimatization period than an existing, dry property. In such situations, four to six weeks is not unusual. Ideally, stack the wood horizontally with sufficient space between the stacks so that air can circulate freely around them.
High-quality oak, such as oak slab planks, sometimes needs a little more time than fast-growing wood due to its dense grain structure. This is not a drawback — it is simply a characteristic of the material.
Oak that is laid too soon will move. This means it shrinks or expands after being fixed in place, leading to visible gaps, raised joints, or in serious cases, boards coming loose. Oak is a species that reacts sensitively to changes in moisture, and that reaction does not stop once the floor is finished.
Specifically, the following problems may occur:
These problems are not always visible immediately after installation. They can appear weeks or months later, when the heating comes on or the season changes. Prevention is considerably easier than repair.
The ideal conditions during acclimatization are an indoor temperature between 15 and 22 degrees Celsius and a relative humidity between 45 and 65 percent. These are the same conditions the floor will experience during normal use, and the wood needs to be prepared for them.
During the acclimatization period, ensure the following:
A contractor or floor installer who skips or shortens this process to save time is taking a risk that the client will later see reflected in the floor.
Antique oak that has been stored outdoors or in an unheated space for many years often requires less acclimatization time than freshly sawn wood, though this depends heavily on the material’s history. Wood that has been kept dry for decades has a stable moisture content and adjusts relatively quickly to a dry indoor environment.
At the same time, antique oak that has been recently sawn or processed behaves like fresh wood. The surface may be dry, but the core can still contain moisture. In that case, the standard acclimatization period of two to four weeks still applies.
We work with oak that has undergone a natural drying period of more than five years. This gives the material a stability that freshly sawn wood simply does not have. Even so, we always recommend respecting an acclimatization period for this wood as well, because the transition to a heated indoor space requires an adjustment for every piece of wood. Browse our range of reclaimed wooden floors to get an idea of the available qualities.
The most reliable method is measuring the moisture content with a moisture meter. Oak is ready to be laid when the moisture content is between 8 and 12 percent and stable — meaning two readings taken a few days apart show no significant change.
Do not measure only at the surface. A pin-type moisture meter that penetrates deeper into the wood gives a more accurate picture of the actual conditions in the core. Also measure multiple boards from different stacks, as variation within a batch is normal.
In addition to moisture readings, there are practical signs that the wood is not yet ready:
That last point is critical: the moisture content of the subfloor and the wood must be aligned. A dry oak board laid on a still-damp concrete floor will absorb that moisture regardless, with all the consequences that entails.
Installing oak flooring starts long before the first board is placed on the floor. We think along with you through the entire process: from material selection to the conditions under which the wood performs best.
Would you like to know which wood suits your project and how to properly prepare for the installation process? Visit the timber yard in Doorwerth and see the material up close.